BUILDING PERMIT FEE SCHEDULE
TOTAL VALUATION
FEE
$1,000 and less No fee, unless inspection required, in which case a $12.00 fee for each inspection shall be charged
$1,000 to $50,000 $12.00 for the first $1,000 plus $4.00 for each additional thousand or fraction thereof, to and including $50,000
$50,000 to $100,000 $208.00 for the first $50,000 plus $3.20 for each additional thousand or fraction thereof, to and including $100,000
$100,000 to $500,000 $368.00 for the first $100,000 plus $2.40 for each additional thousand or fraction thereof, to and including $500,000
$500,000 and up $1,328.00 for the first $500,000 plus $1.60 for each additional thousand or fraction thereof
POOLS
Public Swimming Pool $50.00
Private Swimming Pool $25.00
Note: Do not issue pool permit until a licensed electrician has purchased an electrical permit
MOVING FEE
For the moving of any building or structure, the fee shall be $100.00
DEMOLITION FEE
For the demolition of any building or structures, the fee shall be:
0 up to 100,000 cu ft $50.00
100,000 cu ft and over $0.50/1,000 cu ft
PENALTIES
Where work for which a permit is required by this code is started or proceeded prior to obtaining said permit, the fees herein specified shall be doubled, but the payment of such double fee shall not relieve any persons from fully complying with the requirements of this code in the execution of the work nor from any other penalties prescribed herein.
PLAN CHECKING FEES
When the valuation of the proposed commercial construction project exceeds $1,000 and a plan is required to be submitted - a plan-checking fee shall be paid to the Building Official at the time of submitting plans and specifications for checking. Said plan-checking fee shall be equal to one-half of the building permit fee. 
ANNUAL FIRE SPRINKLER SYSTEM FEES
4" Attachment  $50.00 per year plus $0.05 per head for all over 500 heads
6" Attachment  $120.00 per year plus $0.05 per head for all over 500 heads