GAS PERMIT FEE SCHEDULE
-
For issuing each permit, a fee
of $5.00 will be charged;
-
The total fees for inspection
of consumer’s gas piping at one location (including both rough and final
piping inspection) shall be $5.00 or one unit and $1.00 for each additional
unit;
-
The fees for inspecting conversion
burners, floor furnaces, incinerators, boilers, or central heating or air
conditioning units shall be $5.00 or one unit and $1.00 for each additional
unit;
-
The fees for inspecting vented
wall furnaces and water heaters shall be $2.50 for one unit and $1.00 for
each additional unit;
-
The fee for inspection of gas
logs shall be $10.00.
-
The fee for inspection of the
installation of a new gas line will be $10.00.
-
If a reinspection is required,
an additional fee of $5.00 will be charged;
-
If any person commences any
work before obtaining the necessary permit and inspection, fees shall be
doubled; and
-
Any and all fees shall be paid
by the person to whom the permit is issued.